QTP 11 HotFix for Slow Results Viewer

Automation Guild Online Conference Top ad

If you've upgraded to QTP 11 recently and are finding that the Results Viewer is taken a long time to display test results, then you should install HP's hotfix RRV_00013. This patch will fix the following issues:

1. Reduces the amount of time it takes to open large run results.
2. Reduces the amount of time it takes to export large run results.
3. Displays the data table in results for business process tests created using Quality Center 10.00.
4. Provides support for multiple icon file types (in addition to *.ico) including *.png, *.jpg, and *.gif.
5. Fixes various issues that prevented the run results tree from being displayed correctly.
6. Fixes an issue that sometimes caused the Run Results Viewer to crash.

To get the hotfix RRV_00013, contact HP, or you can download it from here

1 comment
Shalabh Dixit - January 24, 2012

Hi Joe,

I have installed this patch in my QTP 11.0 machine and strangely I’m unable to generate the report in PDF and Doc format after installing. Earlier it was working fine.
Could you please provide your inputs on this.

Thanks
Shalabh Dixit

Reply
Click here to add a comment

Leave a comment: